Size of Project
10 Km
Date of Completion
April 2026
Stabilized the riverbank using durable stone pitching to prevent erosion during heavy rainfall and high water flow. Enhanced long-term structural integrity while protecting surrounding infrastructure.
Stabilized the riverbank using durable stone pitching to prevent erosion during heavy rainfall and high water flow. Enhanced long-term structural integrity while protecting surrounding infrastructure.
Stabilized the riverbank using durable stone pitching to prevent erosion during heavy rainfall and high water flow. Enhanced long-term structural integrity while protecting surrounding infrastructure.




